United projects at IAH
Terminal B transformation
◆Under construction Terminal
Joint build Target fall 2026 $2.6B 22 gates
United's rebuild of 1969-vintage Terminal B: a 765,000 sq ft North Concourse with 22 new gates, a nearly doubled central processor for check-in, security and baggage claim behind ~67,000 sq ft of glass, 18 modernized South Concourse regional gates, and a new bag system. United is in for $1.9B+, the City of Houston ~$624M. The B lobby has been closed since January 2025 — B passengers check in at Terminal C until it reopens.
United Club, Terminal B North
◆Under construction United Club
United builds Target by end of 2026 54,000 sq ft
The headliner: a 54,000 sq ft club on the new North Concourse's mezzanine — the largest in United's network and likely the largest airline-branded lounge in the country, more than 50% bigger than the Denver club that currently holds United's crown. Tied to the concourse's fall 2026 completion, so if the concourse slips, the club slips.
United Club Fly, Terminal B South
●Open Club Fly
United builds Opened February 25, 2025
United's second grab-and-go Club Fly (after Denver), near gates B12/B20: barista coffee, grab-and-go food, a charging counter — no seating, no alcohol. Built for connectors who want ten good minutes, not two loitering hours.
International terminal redevelopment (ITRP)
●Open Terminal
Airport builds Opened February 2026 $1.5B
Houston Airports' own $1.46B program — not United's money, but United's international passengers live in it: the six-gate D-West pier (open since October 2024), a new international ticketing hall, and a rebuilt roadway. 'Open' here means substantially complete — the airport's stated February 2026 finish for the last item, baggage-system certification, not a ribbon-cutting.
The read on IAH
Terminal B transformation is the clearest headline at IAH: United's rebuild of 1969-vintage Terminal B: a 765,000 sq ft North Concourse with 22 new gates, a nearly doubled central processor for check-in, security and baggage claim behind ~67,000 sq ft of glass, 18 modernized South Concourse regional gates, and a new bag system. United is in for $1.9B+, the City of Houston ~$624M. The B lobby has been closed since January 2025 — B passengers check in at Terminal C until it reopens. Across the full list, 3 of 4 projects are led or jointly built by United; the rest belong to the airport authority and affect United's operation without being United capital projects.